Aiming to improve productivity, reduce construction costs for loading and unloading of bulk cargo at wharves, Vina Logistic has ordered us to design and build up a transit system to optimize the loading and unloading of bulk cargo from containers to ships.

At this project, Amecc South takes on roles from design to construction, procurement, installation, and commissioning.

This is the first product of Amecc South. Despite many difficulties, but with a team of engineers with many years of experience and dedication, we completed the project within 3 months from design to construction, installation, commissioning.

The Shipping Container Flip Frame is also the first product in Vietnam in this field, marking a development step of the freight industry towards increasing specialization.